Hotel Montreal (previously Chateau Blanc), Christchurch

TMCo were engaged to provide energy modelling, hydraulic, mechanical and electrical engineering design for the post-earthquakes renovations.

The gas domestic hot water system was supplemented with a large heat pump that drastically reduced the hotel’s hot water OpEx by half.

A government grant helped offset the cost of adding modern air conditioning into the building also, further reducing the hospitality industry’s killer; OpEx.

Talk with Mike Baker about your hotel and how a small investment can provide excellent cost savings in a short period.