Bishopdale Comm Ctr

Bishopdale Library and Community Centre, Christchurch

The much needed replacement library and community centre replacement building was designed and delivered with full functionality and energy efficiency at its heart, but on a shoe string budget. TMCo provided mechanical, hydraulics, energy, civil and electrical services.  


Antony Gough’s The Terrace, Christchurch

TMCo were engaged to provide energy modelling and the business case study for the district heating scheme for this site. The business case was realised and the scheme was accepted with some buildings on site utlilising the geothermal aquifer fed system.  

Don St Invercargill

Don Street Development, Invercargill

This JV between Calder Stewart and Invercargill City Council is providing much needed modern office and new hospitality space. TMCo provided mechanical, electrical, energy and hydraulics for this project.


Ballantynes Redevelopment, Christchurch

Ballantynes have again committed themselves to the beautification and maintenance of a strong presence in the CBD. This replacement building, including retail, hospitality, offices and car parking is set for completion in 2018. TMCo have pleasure in partnering with Ballantynes to provide mechanical, hydraulic, fire, energy, electrical and civil engineering.

Cholm 111

Cholmondeley Childrens Home, Governors Bay

TMCo provided civil, mechanical, hydraulics, energy and electrical services to successfully deliver this community oriented earthquake replacement building. Warm, quiet and secure, guest are provided respite in an environment conducive to relaxing with amazing views of Governors Bay. The heating and lighting systems are low cost, efficient and effective to operate without being obvious.

Greenstar 1

Greenstar Rating Tool Review

Green Star V3 was the first major review of the Green Star rating tool suite since 2009. As with every building rating system, it is important to refresh the tool to ensure Green Star is up to date and meeting industry needs. The Green Star V3 tool development involved reviewing issues with the current tools, read more


Christchurch Adventure Park

This $20m+ adventure park is the largest of its kind in the southern hemisphere. TMCo provided all civil infrastructure services, water tanks, pump stations, custom on site drainage treatment and disposal systems, as well as mechanical, hydraulic, electrical and lighting designs, plus resource consents. Amazingly the programmed design, construction and park opening was reduced from read more

Justice 1

Christchurch Justice & Emergency Services Precinct

The Christchurch Justice & Emergency Services Precinct (the Precinct) is a $300 million anchor project, led by the Ministry of Justice. The Precinct brings together all justice and emergency services in one purpose-built, leading-edge precinct in central Christchurch. An estimated 2,000 people will work in or use the 42,000m2 Precinct daily. At the peak of read more


Kaikoura District Council Civic Building

TM Consultants were engaged to provide bespoke HVAC solutions for this passive building. Almost all solid timber, the mechanical design needed to reflect the natural look and feel of the building and be unobtrusive as possible. Completed in 2016, this building was modeled allowing the HVAC equipment to be correctly sized saving valuable CapEx and weight read more