Ballantynes

Ballantynes Redevelopment, Christchurch

Ballantynes have again committed themselves to the beautification and maintenance of a strong presence in the CBD. This replacement building, including retail, hospitality, offices and car parking is set for completion in 2018. TMCo have pleasure in partnering with Ballantynes to provide mechanical, hydraulic, fire, energy, electrical and civil engineering.

Picture4

Award-Winning Blackwells Holden & Mazda Showrooms, Christchurch

TMCo successfully delivered this project on time and within budget, completing the mechanical (including bespoke passive ventilation systems), hydraulic, energy, electrical, lighting and fire. TMCo are also proud to announce achieving the highest industry acknowledgement in winning the coveted “design excellence commendation” and “energy excellence” for Blackwells Holden & Mazda Showrooms completed in 2016. Blackwell’s read more

IMG_0037

Spark Building – Cathedral Square, Christchurch

This diamond in The Square further transforms this city into a modern, vibrant and beautiful destination. Providing mechanical, hydraulics, electrical, lighting, communications, fire, civil and energy engineering, TMCo will engineer the 5,085 square metre building mostly occupied by Spark with the balance being retail and hospitality leases. It will achieve a 5 star Green Star read more

Design (29)

100 Moorhouse Ave (5.5* NABERSNZ), Christchurch

TMCo were engaged to provide energy modelling, BMS design, services review and to achieve a NABERSNZ base build rating. Following 12 months of occupation post building completion, the base building rating is certified as 5.5 stars, which means Market Leading performance. This is the first base build NABERSNZ rating in the South Island and was read more

Metropolis

Metropolis, Auckland

Metropolis is a 40-storey, $180m, residential/hotel skyscraper in Auckland. Metropolis is considered one of Auckland’s most exclusive apartment buildings, and as of 2017 it is the tallest residential building in New Zealand. The electrical, mechanical and hydraulic team set out to assess the existing building and provide over 25kWh/m2/annum energy savings through the use of read more

Tannery 3

Woolston Tannery, Christchurch

This project included converting the existing Woolston tannery industrial buildings into a new boutique retail and hospitality complex. The main building in this complex contains approximately 35 separate tenants spread across a floor area of approximately 4,200 sq.m with common carpark areas. The client had a tight deadline for this project; a shortage of retail read more

Greenstar 1

Greenstar Rating Tool Review

Green Star V3 was the first major review of the Green Star rating tool suite since 2009. As with every building rating system, it is important to refresh the tool to ensure Green Star is up to date and meeting industry needs. The Green Star V3 tool development involved reviewing issues with the current tools, read more

14 Show 1

IAG Building 14 Show Place, Christchurch

The 14 Show Place upgrade involved a major concurrent upgrade of structure, fire and services and integrated fit out with the 700 staff member tenant in-situ and as-builts that were both incomplete and wrong with an extremely tight, staged construction programme including stripping, refurbishing and commissioning an 1,100 sqm office floor every 6-7 weeks. It read more

83-Victoria-St_2

83 Victoria Street, Christchurch

83 Victoria Street was the first major commercial development TMCo completed following the Christchurch earthquakes. TMCo provided the basebuild and also the fitout fully detailed design of the mechanical, hydraulic, electrical and energy systems. Energy modelling managed to bridge the gap between developer and tenant by simultaneously achieving CapEx saving for the developers and an OpEx saving read more

104 Vic St

104 Victoria Street, Christchurch

104 Victoria Street is one of several Richard Diver and Clearwater Construction partner projects that TMCo provided engineering services for, including government funded energy modelling. The modelling significantly reduced the size of the mechanical plant as the industry standard factors of safety used to oversize plant were not required. The result was a CapEx saving read more

CAP 1

Christchurch Adventure Park

This $20m+ adventure park is the largest of its kind in the southern hemisphere. TMCo provided all civil infrastructure services, water tanks, pump stations, custom on site drainage treatment and disposal systems, as well as mechanical, hydraulic, electrical and lighting designs, plus resource consents. Amazingly the programmed design, construction and park opening was reduced from read more

Justice 1

Christchurch Justice & Emergency Services Precinct

The Christchurch Justice & Emergency Services Precinct (the Precinct) is a $300 million anchor project, led by the Ministry of Justice. The Precinct brings together all justice and emergency services in one purpose-built, leading-edge precinct in central Christchurch. An estimated 2,000 people will work in or use the 42,000m2 Precinct daily. At the peak of read more