June 22, 2021
The $30m+ development is 7-storeys with a rooftop function space with terracing for indoor/outdoor appeal, eateries and bars at ground level connected by a covered laneway, meeting and private dining spaces on the first floor and 4.5-star quality accommodation above. Construction of the hotel is to be completed in two stages with the first featuring 80 guest rooms. TMCo provided mechanical, hydraulics, electrical, lighting, energy, H1, thermal modelling and seismic design