TMCo were responsible for the detailed design of mechanical HVAC, energy, hydraulic and gas services for this earthquake replacement hotel.
The introduction of two heat pumps to pre-heat the cold water serving mainly the showers provided an annual energy saving of $40,000.
Heat recovery and modern air conditioning systems ensures that energy is used wisely, resulting in the lowest energy per room usage across all hotels in Rydges worldwide portfolio.
